Laserfiche WebLink
Reclamation Costs <br />Henderson Mine <br />February 1984 <br />Page 3 <br />B. Site Specific Reclamation Costs ($ thousands) <br />The following are estimated costs of completing the reclamation of each <br />specific site. Area numbers are correlated to the map. Costs are 1988 <br />dollars. Acreages are projected through 1990. Areas partially revegetated <br />are itemized and assigned appropriate costs to complete the reclamation from <br />the present state of progress. As in the past, "buffer" constitutes lands <br />reserved for future possible disturbance. <br />1. Mine Site (172 acres) <br />a) Dismantle, break even $ 0 <br />b) Grading and site preparation 100 <br />c) Revegetate 116 acres at $2,310/acre 266 <br />d) Buffer, 56 acres 0 <br />Total. .$~3 ~ <br />2. Uent Shaft (one acre) <br />a) Secure shaft opening $ 50 <br />b) fertilize one acre, one application 0 <br />Total. .$-5~ <br />3. Portal Area (28 acres) <br />a) Dismantle, close portal $ 35 <br />b) Revegetate 3 acres at $1,045/acre 3 <br />c) Fertilize 25 acres, one application 1 <br />Tota 1 . .$-~5 <br />4. Surface Railroad (121 acres) <br />a) Dismantle, break even $ 0 <br />b) Grading and site preparation 50 <br />c) Revegetate RR bed, 36 acres at <br />$2,310/acre 83 <br />d) Fertilize slopes, 73 acres, <br />one application 2 <br />e) Buffer, 12 acres 0 <br />Total . .~ 1~~5 <br />5. Mill Yard and Access Roads (123 acres) <br />a) Dismantle, break even $ 0 <br />b) Grading and site preparation 100 <br />c) Revegetate Yard, 95 acres at <br />$1,045/acre 99 <br />d) Buffer, 28 acres 0 <br />Total. 199 <br />