My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139795
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:42:54 PM
Creation date
11/26/2007 8:58:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
8/22/2006
Section_Exhibit Name
Appendix E List of Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Appalachia Mining, L~ <br />• Permit No. 99GA0683 . <br />Initial Approval Colorado Department of Public Health and Environment <br />page 2 Air Pollution Control Division <br />Particulate Matter. 6.40 pounds per day and 0.96 tons per year. <br />PM10 (Particulate Mattercl0 µm): 3.20 pounds per day and 0.48 tons per year. <br />Compliance with the yearly emission limits shall be determined on a rolling twelve (12) month <br />total. <br />The permit holder shaft celarlate emissions monthly and keep a Compliance record on site in <br />order to demonstrate compliance with the above emissbn limitations. Alter the first twelve (12) <br />months of operation, the permit holder shall calculate annual emissions by the end Of each month. <br />Annual emtssiorts shau be calculated based on the previous twelve (12) months' emission data <br />These celwlated annual emissions shall be used to demonstrate compliance with the yearly <br />emission limit listed above. <br />5. This source shall be limited GD a maximum production rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Months records of the <br />achral production rate shaA be maintained by the applicant and made avaAaWe to the DiviSan for <br />inspection upon request (Reference; R'egulafion 3, Part B, III.A.4) <br />Crushing of coal shall not exceed 4,000 tons per day and 600,000 tons per year. <br />Compliance with the years production limits sha0 be determined on a rolling twelve (12) month <br />total. <br />6. Crusher shall be enGosad end spray bars sha0 be used if material moisture content is Insufficient <br />to wntrol particulate emissions. <br />A Revised Air Pollutant Emission Notice (APF~1) shall be filed; (Reference: Reg. 3, Part A,II.C) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant <br />For sources emitting less Phan 100 tons per year, a change In actual emissions of five <br />tons per year or more, above the level reported on the last APEN submitted; or <br />For any noncriteria reportable pollutant <br />If the emissions increase by 50% or five (5) tons per year, whichever is less, above fha <br />level reported on the last ADEN submitted to the Division. <br />b. Whenever there is a change in the owner or operator of any faClity, process, or activity; or <br />c. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment: or <br />d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing ADEN expires. <br />NOTE: A one ton per year emission increase will ocar when the produdion/raw material process <br />rate increase by 25,D00 tons- <br /> <br />04510017!006 <br />ld0/BOOB meEO'60 900E Oi; uef <br />BLi,OL8LE0E xej dSS NOI1DllOd tllfi <br />ver, 2J00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.