Laserfiche WebLink
Stotmweler Mane ent Plan 1288/97 <br />• prepared documenting site conditions prior to winter. All original logs and reports will be <br />maintained by Agile. <br />2.9 Good Housekeeping <br />All work areas will be kept in a neat and orderly condition. All refuse and construction <br />related wastes will be hauled to appropriate disposal facilities. All sanitary wastes will be <br />collected from portable units a minimum of once per week and disposed of at a licensed <br />facility. <br />2.10 On-Site Product Specific Storage Practices: <br />Agile is responsible for prepazation of a project Spill Prevention Control and <br />Countermeasure Plan which is incorporated into the SWMP. <br />Petroleum and pain~roducts <br />Bulk fuel storage tanks will be placed on impermeable pads. Berms will provide for <br />containment of the capacity of the largest installed tank plus freeboard of 12". Fuel <br />storage aeeas will be regulazly inspected for leaks or spills. Other petroleum products will <br />be stored in properly labeled tightly sealed containers and regularly inspected. Equipment <br />and vehicles will be regularly inspected for leaks and any noted leaks will be promptly <br />repaired. <br />Fertilizers <br />• All fertilizer material will be obtained in waterproof or water-resistant bags. Each bag will <br />be marked with the weight and manufacturer's guazanteed analysis of the contents showing <br />the percentage of each ingredient contained. Fertilizer will be applied at the rate <br />recommended by soil analysis and it will not be over applied. Solid fertilizer will be <br />worked into the soil upon application to reduce fertilizer content in storm water runoff. <br />Hazardous Waste <br />No hazardous waste materials will be disposed of on site. <br />2.11 Spill Prevention and Cleanup <br />All spills will be cleaned up immediately after discovery. Spills of toxic or hazardous <br />materials will be properly reported to the Agile representative and to the appropriate State <br />and Local government agencies. Agile is responsible for prepazation of a project Spill <br />Prevention Control and Countermeasure Plan which is incorporated into the SWMP. <br />2.12 Employee Training <br />Agile is responsible for training all of it's on-site employees regarding the components and <br />goals of the SWMP. <br />2.13 Long Term Inspections and Maintenance <br />The individual SWMP sites will be inspected during the first growing season following <br />reclamation of an area to determine if any maintenance is required or if vegetation is <br />. becoming established. Maintenance and reseeding will be conducted as necessary. <br />Page 4 <br />