Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Agency or organization name : DMG <br /> <br />Task # : 003 State :Colorado Permivjob# : M-2000.030 <br />Dale : 05/182000 County : La Plara Abbreviation :none <br />User: RCO Sila:Agn-Dld Gravel Pr! Filename: M030-003 <br />Permit or other job action : New appllcatron - final reclamarlon <br /> <br />Task description :Grade pi111oor: Phase 1 and active phase <br />HOURLY EQUIPMENT COST Basic machine :Cal D9N (1995) Horsepower : 370 <br />Blade type : Seml-Universal <br />Adachmenl no. 1 : ROPS Cab Shig basis : f per day <br />Attachment no. 2 :3-shank upper <br /> Utilization Ye Cost data source : (CRG) <br />Cost Breakdown : Ownership cosVhour : 541.20 NA <br />Operating cosUhcur: 581.00 f00 <br />Ripper op. casl/hcur: 50.00 0 <br />Operator cost/hour: E23. 12 NA <br />Total unit cosvhour: 3145.32 Total Oeet casUhour: $145.32 <br />Initial Swell Loose <br />volume: 5,647 CCY lector: 1.125 volume: 6,I5J LCY <br />Source of quantity take-o0 : Phase 1(9.8 ac) t Avg phase Boor (4.2 ac) = 14 ac z 3"depth <br />Source of est. swell factor : Na <br />Average push distance: 150 feet <br />Unadjusted hourly production : 836 LCYlhr <br />Material consistency description <br />Lomoacrer101/ or embankment <br />Average push gradient : 0.00 % (post <br />Average site altitude : 6,600 feel <br />Material weight : 2,550 IbsILCY <br />Material weight description <br />Far1M1 - rlrv na~Lai <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br /> <br />Operator skill : <br />0.75 Source <br />(aLp.J <br />Material consislancy: 0.90 (Car HB, <br />Dozing method : 1.00 (gen.) <br />visibility: 1.00 (avg.) <br />Job efficiency: 0.83 (1sh/07da <br />Spoil pile: 0.70 (InrpmQ <br />Push gradient : 1.00 (Cat HB, <br />Altitude: 1.00 (Cal HB <br />Material weight : 0.90 (Cat HB <br />Blade type : 1.00 (S or U) <br />Net correction : 0.35 <br />Adjusted unit production : 295.47 LCY/hr <br />Adjusted 8ee1 production : 295.47 LCY/hr <br />Total lob lime : 21.50 Hours <br />Unit cost : 80.492 /LCV Total job cost : SJ, 124 <br />