My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139415
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:15 PM
Creation date
11/26/2007 8:38:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Permit File
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br /> <br />Task 11 : 002 Slate :Colorado PermiVobp : M-2000-OJO <br />Date : 05268000 County : La Plata Ahbrevialion :none <br />User: RCO Sile :Agn-D/d Gravel Pit Filename:M030-002 <br /> <br />Permit or other job action :New application -final reclamation <br /> <br />Task desorption :push overburden down slope, create fina13:1 <br /> <br />HOURLY EQUIPMENT COST Basic machine : Cat D9N (1995) Horsepower : 370 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank dpper <br /> <br /> Utilization Yo Cost data source: (CRG) <br />Cost Breakdown : Ownership cosllhour : 441.20 NA <br /> Operating cosUhour : 487.00 100 <br /> Ripper op. cosUhour: 40.00 0 <br /> Operator cosUhour: E23.12 NA <br /> Total unit cosghcur : 8145.32 Total Seel cost hour : 5145.)2 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 19,360 CCY laclor <br />Source of quantity lake-oft : Rec/am plan. <br />Source of est. swell laclor : Na <br />Average push distance : BO feel <br />Unadjusted hourly production : 1264 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Loose <br />1.165 volume <br />4 ac x 3' avv deoth overburden <br />Average push gradient: 20.00 % (neg) <br />Average Bile altitude : 6,600 feet <br />Material weigh) : 2,650 Ibs/LCY <br />Material weight description <br />Decomposetl rock - 25% Rock. 75% EaM <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : 40.213 /LCY <br />22,554 LCY <br /> <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consisfeney: 1.00 (Cat HB <br />Dozing method : 1.00 (gen.) <br />Vsibiliry: 1.00 (avg.) <br />Joh efficiency: 0.83 (1shlNda <br />Spoil pile: 0.70 (lndm/, <br />Push gradient : 1.43 (Cat HB <br />Altitude: 1.00 (Cat HB <br />Material weight: O.B7 (Cat HB <br />Blade type : L00 (S or U, <br />Nel correction : 0.54 <br />Adjusted unit production : 681.73 LCY/hr <br />Adjusted Oeel production : 681.7) LCY/hr <br />Tclal job lime: 37.08 Hours <br />Total joh cost: 34,808 <br />
The URL can be used to link to this page
Your browser does not support the video tag.