Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> Agency or organization name : DMG <br /> <br />Task # : 001 Stale :Colorado PermiVjob# : M-2000.030 <br />Date : 0526/1000 County : La Plafa Abhreviation :none <br />User : RCO Site : Agd-Dltl Gravel Pit Filename : M030-001 <br /> <br />Permi t or other joh action :New app8cafion -Onal reclamation <br /> <br /> Task description :Reduce highwa7l, cut and fill, fp 2:1 <br /> <br />HOURLY E QUIPMENT COST Basic machine: Car D9N (1995) Horsepower: 370 <br /> Blade type : Sem/-Universal <br /> Adachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank upper <br /> Utilization Yo Cost data source: (CRG) <br /> Cost Breakdown : Ovmership cost/hour : E41.20 NA <br /> Operating cosVhour: E81.00 100 <br /> Ripper op. cost hour: 50.00 0 <br /> Operator cosVhour: 523.12 NA <br /> Total unit cosUhour : 5745.32 Total Meet cosVhour : 5145.)2 <br />MATERIAL QUANTITIES <br /> <br />Initial Swell Loose <br />volume: 2,083 BCY factor: 1.430 volume: 2979 LCY <br />Source of quantity take-ol(: Reclamation plan 8 map <br />Source of e51. swell factor : Na <br />Average push distance : 50 feet <br />Unadjusted hourly production: 1fi96 LCY/hr <br />Material consistency description <br />Compacted nll or embankment <br />Average push gmdienl : 20.00 % (negJ <br />Average site altitude : 6,600 feel <br />Material weigh) : 3,300 Ibs/LCY <br />Material weight description <br />Decomposetl rock - 75% Rock, 25% Earth <br />JOB TIME AND COST <br />Fleet site : 1 Dozers) <br />Unit cost : E0.192 /LCY <br /> <br />Operator skill: <br />0.75 Source <br />(avg.) <br />Matedal censistency : 0.90 (Car HB, <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency: 0.83 (1shlNda <br />Spoil pile: O.BO (/nd-rq <br />Push gradient : 1.43 (Caf HB, <br />Altitude : 1.00 (Cat HB, <br />Material weight : 0.70 (Ca(HB, <br />Blade type : 1.00 (S or UJ <br />Net correction : 0.45 <br />Adjusted unit production : 755.22 LCY/hr <br />Adjusted Beet production : 755.22 LCY/hr <br />Total job lime: J.94 Hours <br />Total jab cost : $573 <br />