My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE139415
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE139415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:40:15 PM
Creation date
11/26/2007 8:38:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000030
IBM Index Class Name
Permit File
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br /> Agency or organization name : DMG <br />Task tl 004 Stale' Colorado PermiUjob p : M-2000-030 <br />Dale : OYl6/2000 County : La Pala Abhreviation : none <br />User: RCO Sile:Agd-Dld G2vel Pit Filename: M030.004 <br /> <br />Perm it or olherjob action :New application - Ona/ reclamation <br /> Task description ~ Rip compaction on pit /loon <br /> <br />HOURLY EQ UIPMENT COST Basic machine: Cat D9N (1995) Horsepower : 370 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shig basis : 1 per day <br /> Ahachment no. 2 : 3-shank upper <br /> Utilization Y Cost data source : (CRG) <br /> Cost Breakdown ' Ownership cosUhour: 841.20 NA <br /> Operating cosUhour: SB7.00 100 <br /> Ripper op. cosUhour: 88.84 100 <br /> Operator cosUhour : 823.12 NA <br /> Total unit casUhour : 8154.16 Total Beet cosVhr : $1$4.15 <br />MATERIAL QUANTITIES <br /> Selected estim ating method : A/ea <br />Seismic <br />method : NA NA Load factor : NA Bank volume : /1/f( BCY <br />Area <br />method : 14.00 Acres Rip depth (R): 1.50 volume : 33,880 BCY or CCY <br />Source of quantity take-all : Re <br />Source of material load !actor : NA <br />9.B + q.2 ac total pit Boor <br />Seismic method : Material seismic velocity : NA leet per second <br /> Unadjusted hourly production : NA BCY or CCY/hr <br />Area method : Average ripping depth per pass : 1.50 leet <br /> Average ripping width per pass : 7.67 leet <br /> Average ripping length per pass : 400.00 !eel <br /> Average velocity o(machine : 88.00 !eel per minute <br /> Average machine maneuver time /pass : 0.25 minutes <br /> Hourly production per unit area : O.BB7 acres per hour <br /> Unadjusted hourly production : 2, 132.SB BCY or CCY/hr <br />Correction !actors : Unadjusted hourly production : 2,132.58 BCY or CCY/hr <br /> Site altitude : 6,600 feel <br /> Altitude adjustment : 1.00 (Car H8J <br /> Joh e(fciency !actor: 0.83 (1 shiNdayJ <br /> Net ioh correction : 0.83 multiplier <br /> Adjusted hourly unit praduclion : 1,770.04 BCY or CCY/hr <br /> Adjusted hourly gee! praduclion : '/, ]]0.04 BCY orCCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 18.14 Hours <br />Unit cost : 80.087 /LCY Total jab cost : $2,8$1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.