Laserfiche WebLink
RECLAMATION CO~MMARY con['d sT1llst 2 of 4 <br />D. EARTHNORK - FILL COMPACTION <br />Task No.~ Task Description ~ Cost (E) <br />incl in tasks 1.2 <br />Subtotal (D ): <br />E. EARTHNORK - RIPPING <br />Task No. Task Description ~ Cost (E) <br />___..____I______~___________________________________________I___.,_______ <br />4 ~ Rip compaction on pit floor ~ E2, 951 <br />Assume 9.8 ac phase T plus 4.2 ac avg floor of <br />remaining active phase <br />Subtotal (E ): E2, 951 <br />F. EARTHNORK - ROAD RECLAMATION <br />Task No. Task Description ~ Cost (E) <br />__________________________________________________________I__________ <br />n/a <br />Subtotal (F) <br />G. EART HIIORK - FINISH GRADING <br />Task No. Task Description ~ Cost (E) <br />___~____I______________________________~___________________I____________ <br />3 ~ Grade pit floor, phase 1 plus active phase ~ E3, 124 <br />Assume 14 ac a avg 3" depth <br />other finish grading tasks incl in topsoil cork <br />________________________________________________________________________ <br />Subtotal (G): E3,124 <br />