Laserfiche WebLink
1 of 4 <br />orado Division of Minerals and Geology <br />RECLAMATION LOST SUMMARY FORM <br />_____________________________ <br />_____________________________ <br />PERMIT NUMBER M-00-030 PREP. BY: RLO FILENAME: X030-0 <br />___ 9 ______ ____ ______ <br />DATE : •••*••••** OPERATION: A ri-Dld Gravel Pi[ <br />PERMIT ACTION Neu application - final rec lamaTion <br />GRAND TOTAL BOND AMOUNT 539,453 <br />I.-DIRECT-COSTS==:==___:____--:_:_______::___::_____-.:_::______________ <br />A. EARTHWORK - BACKFI LLING 8 ROUGH GRADING <br />Task No. Task Description Lost (S) <br />___.,____I__________________________________________________I____________ <br />1 ~ Reduce highwall, cut and fill, to 2:1 ~ 8573 <br />Assume existing 0.5:1, 30' vert ht, 500 LF <br />Subtotal (A ): 5573 <br />B. EARTHWORK - HI GHWALL REDUCTION <br />Task No.l Task Description ~ Lost (E) <br />2 Push overburden down slope, create final 3:1 ~ 54,808 <br />Assume 3' avg depth overburden from 5 ac avg phas~ <br />to be pushed dawn slope <br />________________________________________________________________________ <br />Subtotal (B): E4,B08 <br />L. EARTHWORK - WASTE PILE COVER PLACEMENT <br />Task No. cask Description ~ Cos[ (E) <br />__________________________________________________________I__________ <br />incL in demolition work, task 10 <br />iii iiiiuiiiiiu iii <br />999 <br />l=fL~: _z-ooo_a3o <br />SlT~: (~~-1~D ~ <br />Subtotal (C ): <br />