Laserfiche WebLink
RECLAMATION CO~MMARY cont'd s~t 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Descrip[i on ~ Lost (f) <br />n/a <br />Subtotal (H ): <br />__________ <br />I. EART HVORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Cost (f) <br />n!a <br /> Subtotal (1): <br />J. EARTHUORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l <br />________I <br />________ Task Description <br />__________________________________ ~ <br />________I_ Cos[ (E) <br />___________ <br />5 ~ Spread topsoil on slope, active phase f128 <br /> Assume 1.1 ac slope area (100' x 500') x 3" depth <br />6 ~ Load and carry topsoil from stockpile to pit flool (4,097 <br /> Assume 1 loader and 3 trucks, from upper st ockpil~ <br />7 ~ Spread topsoil on pit floor ~ f2,079 <br /> Assume dozer work an dumped topsoil <br />Subtotal (J): f6, 304 <br />