Laserfiche WebLink
PART I <br />Page 6a of 20 <br />• Permit No. CO-0033367 <br />B. MONITORING REQUIREMENTS <br />1. Frequency and Sample Type (Cont.) <br />(b) Discharge Point 004 <br />Effluent Parameter Measurement Frequency d/ Sample Type e/ <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />011 and Grease, mg/1 f/ Weekly Visual or Grab <br />pH, s.u. Weekly Grab <br />Total Residual Chlorine, mg/1 1/ Weekly Grab <br />Total Suspended Solids, mg/1 Monthly Grab <br />BODS, mg/1 Monthly Grab <br />Fecal Coliform, org/100 ml Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />Sampling by the permit tee for compliance with the monitoring <br />requirements specified above shall be performed at the following <br />locations: at 004, as shown in Figure 1. <br />• Monitoring by the Division for the purpose of compliance and/or <br />enforcement of the effluent limitations shall be performed as per <br />"Sample Type" specified above, <br />Reporting of the above data shall be on a quarterly basis. Refer to <br />Part I. D.2 for specific requirements. <br />In addition to monitoring at the designated outfall, the following <br />parameters shall be monitored as indicated in subsections (c) and (d) <br />below: <br />(c) Discharge Point 045 <br />Effluent Parameter <br />Measurement Frequency d/ Sample Type e/ <br />Flow, MGD Weekly Instantaneous <br />or Continuous <br />BODS, mgJl Monthly Grab <br />Total Suspended Solids, mg/1 Monthly Grab <br />Monitoring shall be performed on the sewage treatment plant effluent <br />at discharge point 045, as shown .in Figure 1. <br />Reporting of the above data shall be on a quarterly basis. Refer to <br />Part I. D.2 for specific requirements. <br />See Part I.C. for Footnotes. Amended /a~a/~$8 <br />