Laserfiche WebLink
PART I <br />Page 6b of 20 <br />Permit No. CO-0033367 <br />B. MONITORING REQUIREMENTS <br />1. Frequency and Sample Type (Cont.) <br />(d) Sewage Treatment Plant Influent <br />Effluent Parameter <br />BODS, mg/1 <br />Total Suspended Solids, mg/1 <br />Measurement Frequency d/ Sample Type e/ <br />Monthly Grab <br />Monthly Grab <br />Monitoring shall be performed on the sewage treatment plant influent <br />at a point prior to treatment. <br />Reporting of the above data shall be on a quarterly basis. Refer to <br />Part I. D.2 for specific requirements. <br />Amended /~~o1~~8S <br /> <br />~~ <br />