• imately 0.03 acres. Excavation will be done with a backhoe <br />or dozer; topsoil material will be excavated first and stored <br />for later replacement and revegetation. <br />4. Drilling <br />Drilling and coring will be accomplished with Model 524 <br />Portadrills, or like equipment, using mud, foam or airlift <br />methods. Water for drilling will be hauled in a 3,000 gallon <br />or similar water truck from the Southfield Mine water <br />sources. Drill cuttings and fluids will be contained in the <br />mud pits or within the drill pad area. A van-type geophysi- <br />cal logging truck will run standard electrical induction, <br />natural gamma and caliper logs on each completed drill hole. <br />5. Drill Hole Abandonment <br />As each drill hole is finished, it will be sealed to within <br />10 feet of the surface with abandonment drill mud and drill. <br />cuttings with the exception of the borehole site. During <br />drilling, each hole will be monitored to detect any water <br />producing zones. Any such aquifer zones will be sealed with <br />. cement grout extending 10 feet above and below the limits of <br />the estimated water producing zone. A cement plug will be <br />placed above the abandonment fluid up to approximately 3 feet <br />• below the ground surface. Soil will be used to fill the <br />remaining distance along with a metal stake protruding <br />through the surface for future drill hole identification. <br />6. Drill Site Rehabilitation <br />All drill sites requiring pad leveling will be regraded after <br />completion of drilling to their approximate original shape. <br />Stored topsoil will then be redistributed over the disturbed <br />area in preparation for revegetation. All mud pits will be <br />allowed to dry prior to backfilling. During backfilling, <br />nonsoil material will be first placed in the pit followed by <br />topsoil, then graded to their approximate original configura- <br />tion. Regrading and backfilling will be accomplished with a <br />dozer and/or backhoe. <br />7. Drill Site Cleanup and Seedbed Preparation <br />All trash and debris will be removed from each drill site and <br />hauled to the Southfield Mine for disposal. Any remaining <br />,drill cuttings which are exposed at the sites will be spread <br />such that they are unnoticable. Finally, the disturbed <br />ground surface at each site will be scarified in order to <br />provide a good seedbed. The maximum anticipated disturbance <br />for each drill site is approximately 0.1 acres, resulting in <br />• a total site disturbance of 0.3 acres. <br />