Laserfiche WebLink
• 8. Access Route Rehabilitation <br />Those areas where roadwork is necessary for access will, upon <br />cessation of use, be regraded to theft approximate original <br />shape. Topsoil will then be redistributed over the disturbed <br />area and the surface prepared for seeding. Any existing <br />access roads and trails, and areas requiring grubbing work <br />for access, should not require rehabilitation or reclamation <br />work. No roadwork disturbance is anticipated for the drill- <br />ing project. Note that for bonding calculations the total <br />length of all drill trails is considered for reclamation. <br />9. Revegetation <br />Each area will be broadcast seeded, following seedbed prepa- <br />ration, utilizing the following seed mix: <br />Species <br />Intermediate Wheatgrass <br />Western Wheatgrass <br />Side Oats Gama <br />Sand Dropseed <br />Cider Milkvetch <br />Bulk lbs/acres <br />14 .0 <br />8.0 <br />6.0 <br />0.4 <br />2.0 <br />• Total 30.4 lbs/acre <br />*This rate is for broadcast seeding, only. Drill seeding <br />should be done at half the rate shown.- <br />Broadcast seed will be raked or otherwise mixed with the <br />topsoil. In areas where high potential for erosion exists, <br />or where reclaimed slopes exceed 3 horizontal to 1 vertical <br />(3:1), straw mulch will be applied at the Cate of 2,000 lbs. <br />per acre as the final step. <br />Bonding Calculations <br />Energy Fuels Coal, Inc. has utilized the Colorado Mined Land <br />Reclamation Division Exploration Bonding Calculations to determine <br />the amount of reclamation bond, attached as Exhibit 2, Bonding <br />Calculations. Following is a summary .of reclamation costs for the <br />proposed drilling project: <br />Operation <br />Sealing drill holes <br />Plugging drill holes <br />Backfill mud pits <br />Regrade drill sites <br />Regrade drill trails <br />• Reseed drill sites and trails <br />Mobilization <br />Reclamation Cost <br />$1,134.00 <br />132.00 <br />720.00 <br />360.00 <br />624 .00 <br />667.00 <br />330.00 <br />Total reclamation cost: $3,967.00 <br />Round to :. $4,000.00 <br />