Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />C~ <br />E~IBIT L (Cont'd) <br />Estimated Acres t <br />Feed/ <br />Revege- ~tiork <br />Phase Slane Road tation Areas <br />Trees-1 <br />Russian <br />Olives <br />,215 total <br />Cotton- <br />:voods <br />I-XI(A) x 2 4.48 1.59 7.35 -- ]95 21 <br />~-G(A) x 3 0 G.56 12.67 6.84 0 0 <br />Y(A) _ 3 -- 0.32 1.78 4.15 0 0 <br />Z(9) -- 0.83 0.86 3.43 5 0 <br />Totals 4.48 3.10 22.66 14.42 200 21 <br />Revegetation 22.66 act @ $413.02/ac $ 9,359.00 <br />Trees 221 L $0.85/each 187.85 <br />Slope grading 4.48 a c t @ $160/ac 716.80 <br />and reshaping <br />Road grading 3.10 a c± @ $160/ac 496.00 <br />and shaping <br />Feed and work 14.42 a c ± @ $160/ac 2,307.20 <br />area grading <br /> Total reclamation cost $13,033.85 <br />The o,ne.tato.t undena.tanda .tha.t .the board'a ~.n.ten.t~.on ~.a <br />.to :set .the amount oS .the bond a.t a ZeveZ wh~eh w~.ZZ p•tav.tde <br />flo.t ade.qua.te neeZama.t~.on n5 .the exeava.t.~ol2 cpzn.a.t~.on a.t any <br />g~.ven .t~.me. The opzn.a.ton be£.teve.e .that .the bua.td'a ~,n.ten.t~.on <br />can be meae .than ade~%ateZy met by a bond o~ $13,000. <br />41 <br />