Laserfiche WebLink
' • EXfiI8I1' L (,Cont'd) <br />1 <br /> <br />I <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br />1 <br /> <br /> <br />Estimated A~:res <br />Feedj Trees <br />Revege- N'ork Russiar, Cotton- <br />Slooe Road tation Areas Olives woods <br />IX(A) 3.96 1.12 8.37 -- 195 11 <br />X(A) 1.73 0.79 3.73 -- 63 5 <br />D(A)-Part 2 -- 0.55 8.94 1.23 0 0 <br />E(A) -- 0.03 6.37 6.6c 0 0 <br />Y(Aj* -- 0.32 1.78 4.15 0 0 <br />L(A)* -- 0.83 0.86 3.43 5 0 <br /> <br />Totals 5.69 3.57 30.05 15.47 ?_63 16 <br />*Tw0 five-year periods over the entire 30-year life of mine <br />Revegetation <br />Trees <br />Slope grading <br />and reshaping <br />Y.oad grading <br />and shaping <br />30.05 act ~a $413.02/ac <br />279 ~ $0.85/each <br />5.69 acf ~ SI60/ac <br />3.54 act ~ $16G/ac <br />$12,411.25 <br />237.15 <br />910.40 <br />566.40 <br />Feed and Nork 15.47 ac± C $160/a.c 2,475.20 <br />Area grading <br />Total reclamation cost $16,600.40 <br />These estimated reclamation. costs by phases are on the <br />extremely high side. The phases used are by far snd away <br />larger than any other phases in the project. Although the <br />maximum phase ccst, according to the above calculations, is <br />$16,600.40, reciariaticn costs based on the average phasa cos+. <br />would be of more bene~it to tL•e state and to the operator. <br />Estimates of reclamation costs based on averaging eaci~ phase <br />of reclamation follow: <br />40 <br />