Laserfiche WebLink
' z <br />hs been mined from an area, the sides :vih be sloped -using a dozer. The slopes will be <br />covered with topsoil <br />t The processing site will be used for crushing and washing the pit run gravel into specification <br />aggregate for road construction, pipe bedding material and aggregate for the production of <br />concrete. <br />' Mining will start in the summer of 1999 after all permits have been obtained. The total life of the <br />pit :will be 12 to li years. <br />1 The depth of the overburden varies from 0 to 6 fee[ with the average being 3.5 feet. The depth of <br />the sand and gravel deposit averages 13.5 leer The underlying material is Mancos Shale. <br />1 The primary product to be mined is sand and gravel. This ma[zria] will be used ,`'or construction <br />aggregate for roads; pipe and concrete. <br />1 <br /> <br /> <br /> <br /> <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />1 <br />