My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138715
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE138715
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:39:24 PM
Creation date
11/26/2007 8:00:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998058
IBM Index Class Name
Permit File
Doc Date
10/29/1998
Doc Name
TELLIER GRAVEL PIT PERMIT APPLICATION REVISED TECHNICAL ADEQUACY RESPONSES
To
CARL MOUNT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />cost per hour. The total equipment unit cost per hour is $ 126.72. <br />The volume of material which needs to be regarded to backfill the final six acres of <br />reclamation based on the depth of overburden from three exploration test holes in this <br />area averages 10.8 feet. This equates to a total material volume of 104,544 LCY. The <br />average push distance is 300 feet and the estimated production rate is 543 LCY per <br />hour; the average slope gradient is 5.00 percent. The average altitude is 6,600'. The <br />estimated material weight is 2,550#/LCY. The adjusted production rate, discounting <br />potential delays is estimated at 406.09 LCY/hour. The total estimated time for backfilling <br />and regrading is 257.44 hours. Using a unit cost of $ 0.310/LCY the estimate cost of <br />backfilling and regrading is $ 32,623. <br />B. Reoradino Costs of Highwall Reduction. Under the assumptions used in this <br />evaluation, there will not be any highwall reduction work necessary since the highwalls <br />on the sides of the area considered for final reclamation will of had to be reclaimed to <br />stay in compliance with the approved Routt County SUP. The highwall areas on the <br />south, west and north of the final mine area will have been backfilled concurrent with <br />the mining of the final mine block since the overburden in the final mining blocks will of <br />had to be excavated and backfilled in these areas to allow mining in the final mining <br />area. <br />C. Haulroad Removal. A section of the mine haulroad running from the top of the hill to <br />the mine pit area across the hillside and crossing the two drainage channels will need <br />to be removed at the time of final reclamation. This area corresponds to a distance of <br />960 feet or an area of 0.45 acres will need to be reclaimed. The equipment to be used <br />in reclaiming the haulroad will be a DSN dozer and a 235 backhoe. The ownership and <br />operating costs for the dozer are presented above. The cost breakdown for the backhoe <br />is an ownership cost of $ 60 per hour, an operating and overhaul cost of $ 40 per hour <br />and an operator cost of $ 25 per hour; with a total equipment cost of $ 125 per hour. <br />The volume of material to be removed from the fill slopes and placed in the cut slope <br />areas is calculated to be 4,000 LCY. The average production rate for a backhoe under <br />these conditions will be approximately 333 LCY per hour and for a dozer assuming a <br />40-foot push on a 20 percent slope will be approximately 700 LCY per hour. Based <br />upon the anticipated correction factors it can be assumed that the adjusted unit <br />production rate of 75% will equal 250 LCY per hour for the tracked hoe and 525 LCY <br />per hour for the dozer. Assuming that half of the material will be moved by the backhoe <br />and half will be moved by the dozer it can be calculated that 8.0 hours of backhoe time <br />and 3.8 hours of dozer time will be required to regrade the mine haulroad. This <br />translates into a job cost of $ 1,000 for the backhoe and $ 481.54 for the dozer cost with <br />a total cost of $ 1,482. The cost to remove the sediment pond at the base of the slope <br />with the haulroad is included in this cost. <br />D. Topsoil Aaolication. The equipment to be used to respread the stockpiled topsoil will <br />be a Cat 627 twin engine scraper. The total equipment cost of this piece of equipment <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.