Laserfiche WebLink
- • ~ • c <br /> ^ PART I II <br /> Page 15 of 17 <br /> ~' ~ ~ Permi <br />: LO-D027154 <br />N <br />+ _ <br />o <br />t <br />• <br /> 6. GEtIER.AL REQUIRENENTS <br /> I. The .ermi[tee shall not discharge after the expiration date of this <br /> permit without authorization. In order to receive authorization to <br /> discharge after [he expiration date, the permittee shall, no later <br /> than 120 days prior to the expiration dat_ of this permit, submit a <br /> neo-+ NPDES application and fees as required by [he permit issuing <br />_ authority, <br /> 2. The permittee is required to submit an annual fee as set forth in <br /> Section 25-E-502 C.R.S. 1973 as amended. Failure to subr..it the <br /> required fee is a violation of this permit and will result in [he <br /> sus7_r.sion of said permit and enforce^ent action pursuant [o Sect~on <br /> 25-2-oCl et- s_p., 1$73 as amended. <br /> 3. Within sixty (60) days of the effective date of this permit, the <br /> permittee shall file a statement with the Environmental PrctecCion <br /> ,_ .. -., __Agency.and the..S.tate,.k'ater.Qyal.i;y Control-Division which shall <br /> contain the names of [he person or persons who are designated to <br /> report conditions as no[_d in "1Joncomgliance", Part 11, Sectior. A, <br /> Paragraph 2, and as referenced in "Oil and Hazardous Substance <br /> Liability", PART II, Sectior. B, Paragraph 8. The permittee shall <br /> continually update this list as chan5as occur a[ [he facility. <br />• 4. Within three (j) months after the effective date of this permiC. a <br /> flora-measuring device shall be installed at all discharge points. <br /> At the revues[ of the Regional Administrator of the Environmental <br /> Protection Aoency or the Director of the State Water Quality Control <br /> Division, the permittee must be able to sho•.~ proof of the accuracy <br /> of any flo~~+-measuring device used in obtaining data submitted in <br /> the moni[orinc report. The flow-measuring device must indicate <br /> values ~•+ithin ten (10) percent of the actual flow being discharged <br /> from [he facility, <br />5• Discharge points shall be so desicned or r..odified that a sample o~ <br />the effluent can be obtained at a point after the final [rea[m2nt <br />process and prior to discharce to state ~aa[ers. <br />• ?/°1 <br />