Banks and Gesso, LLC <br />inside the mine limit shall be stockpiled until the soil/claystone liner is to be installed. <br />Aggregate reserves shall be screened and stockpiled for export at the ancillary facilities <br />site located to the south of East Mine and west of the haul road. As aggregate reserves <br />are depleted within the limits of the perimeter trench, claystone and siltstone shall be <br />excavated to an elevation of 4753' with a key slot for the soil liner at a final elevation of <br />4750'. As claystone is excavated, the material shall be blended with overburden <br />material at a 1:1 ratio and placed in one foot lifts with a moisture content ranging from <br />1 % dry - 3% wet of optimum and compacted at a minimum of 95% of the max dry unit <br />weight. The proctors shall be completed per ASTM D 698 at a rate of 1 test per 5,000 <br />yd3 of placed fill. The total volume of overburden removed and stockpiled during this <br />phase is approximately 59,930 yd3. The estimated volume of soil liner material to be <br />placed within East Mine is 153,500 yd3. The completion of the perimeter trench <br />excavation and the soil liner installation shall seal the reservoir and with the dewatering <br />of the reserves within the limits of the East Mine perimeter trench, the mine operations <br />shall be a dry Mine operation. Once a dry mine condition is achieved, there is no need <br />for augmentation for groundwater losses. <br />Phase II(b) -Completion of East Mine Excavation <br />Phase II(b) of the mining operation is to remove the remaining aggregate reserves from <br />East Mine. It is expected that this Phase will take approximately 12 to 24 months to <br />complete, depending on market conditions. <br />Phase III -West Mine Excavation and Clav Liner Installation <br />Phase III of the mine operation begins with the excavation of a perimeter trench in the <br />West Mine. Overburden will be stockpiled either north of or within East Mine where the <br />excavation of aggregate reserves has been completed and the claystone has been <br />excavated to a final elevation of 4758'. Material will be transported via haul trucks <br />between the West Mine, East Mine and Processing Area. <br />Once groundwater has been exposed, augmentation for groundwater losses shall once <br />again commence. The perimeter trench shall be excavated in the same manner as was <br />completed in the East Mine mining phase II; however the perimeter trench of the West <br />Mine shall serve mainly as a dewatering trench where groundwater can be pumped to <br />the B.H. Eaton ditch and eventually released to the Poudre River. The mining of the <br />Raindance Sand and Gravel Mine March 16, 2004 <br />Hilltop Aquatic Investments, LLC q 04001 <br />