Laserfiche WebLink
<br />~.. <br />_..~- <br />ST2. Operator will grade and stabilize the area affected by this opera- <br />tion by striking off ridges and peaks to a width of not less than <br />fifteen (15) feet at the top. <br />ST3. Land stabilization and reclamation will be maintained for a period <br />of three (3) years after all mining activities cease, and if the <br />property is sold, leased, or transferred in any manner, the new <br />owner, lessee, or person having control, must file a request to <br />succeed operator (LRB Form 7) with the Colorado Land Reclmmation <br />Board, and shall agree to be bound to tha unexpired period of the <br />three year term. ' <br />Traffic Control <br />T1. Operator will erect warning signs at least three hundred (300) <br />feet on either side of point of ingress and/or egress to or from <br />permit area to a posted and numbered thoroughfare. <br />Water Control, Erosion & Drainage <br />W1. If operator plans to discharge into a waterway, then a permit <br />to discharge into same will be obtained from the Colorado Water <br />Quality Control Commission. <br />W2. Operator will monitor water wells in the vicinity of said operation <br />to observe levels of said well s. and will arrange for a pure water <br />supply for the users or owners of wells affected by any drawdown <br />of the water table as a result, of this operation. <br />W3. Operator will control erosion on or along haul roads by the use <br />of drainage ditches, culverts, or check dams. <br />W4. The amount of water to be pumped into <br />ditch, stream, canal, river <br />shall not exceed cubic feet per second. In the case of <br />a ditch or canal, any time the water level reaches to within six (6) <br />inches from the top of the ditch or canal, pumping shall be cur- <br />tailed until the water level subsides. <br />-5- <br /> <br />