Laserfiche WebLink
<br />~. <br />~. . <br />W5. Operator will construct an earth dam in the final cut of this <br />operation, if necessary to impound water, if such impoundment <br />will not interfere with mining operations or damage adjoining <br />property. <br />W6. Operator will take any neceasary measures to prevent undesirable <br />seepage from water impoundment sites and will provide adequate <br />spillways or other measures necessary to control overflow. <br />W7. Natural drainways or drainways constructed to alleviate flood <br />conditions in the area shall be kept free from overburden, atock- <br />piles, and topsoil. <br />T Yo -P~' <br />W8. Operator will obtain permission from the ~ authorities <br />before using water from any waterway, to prevent usurping any <br />adjudicated water rights. <br />-6- <br />Zonin <br />Z1. Trailers and/or buildings used for office, storage, and maintenance <br />shall meet local zoning regulations. <br />Z2. Special use or other forms of permits shall be obtained from the <br />county agency authorized to grant such permits. <br />Z3. Nothing in this agreement shall subrogate the operator's responsi- <br />bility for compliance with local county zoning requirements. <br /> <br /> <br />