My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE136427
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE136427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:37:06 PM
Creation date
11/26/2007 4:40:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
5/19/2003
Section_Exhibit Name
Tab 17 Reclamation Schedule
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ~J <br />J <br />Proiected Reclamation Schedules <br />The facility was constructed from Fall 1972 to 1979 resulting in a reported esti male of 55 <br />acres of disturbance associated with the handling facilities, office, coal stockpiles, <br />railroad spur/loop, and access road Isee Permit Application for Permit No. C-80-003 at <br />Volume 1, Sec [i on 2.05 and Permit Decision Documents). Hayden Gulch Terminal, Inc. has <br />reevaluated the extent of disturbances associated with construction, and the possible need <br />io disturb additional acreage to accolrmiodate grading to approximate pre-disturbance <br />contours. The results of that evaluation are suimnarized in Table 17-1. The acres given <br />in Table 17-1 reflect actual topsoil and revege[ation liability acres within the proposed <br />permit boundary, and total affected lands. <br />The projected schedule for reclamation of the Hayden Gulch loadout is sunmarized in Table <br />17-2. The disturbance area, with exception to those facilities which are to be retained <br />to compliment the final postmine land use, will be completely reclaimed within one full <br />year after the year in which operations are discontinued. It possible, reclamation wili <br />be completed within the same year as final closure providing sufficient time is available <br />to complete all activities. For example, if final closure occurs in February of year i, <br />reclamation will be completed by the end of that year. If closures occurs in September of <br />• year 1, final reclamation may not be cox~le[ed until the end of year 2. <br />Certain facilities will be retained to compliment the final postmine land use. These <br />facilities include the right-of-ways for Routt County Road 37 and Colorado State Hiohway <br />40, and that portion of the access road extendi no to the County road maintenance yard. <br />Cessation of Operations <br />In the event a cessation of operations is to occur for a period of 30 days or more, or as <br />soon as it is known that a temporary cessation will extend beyond 30 days, the Division <br />will be notified. Within 90 days after notification, a notice of intention to cease <br />temporarily or abandon operations will be submitted to the Division defining Che <br />information required in Rules 4.30.1 and 9.30.2 as applicable. The cessation plan will be <br />developed in consultation with the Division. <br />3a Revised 3/20/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.