Laserfiche WebLink
<br />-~- <br />EXHIBIT E - Nap <br />You must provide a map that clearly describes the features associated with the <br />mining plan and describes the components of the reclamation plan. You may <br />want to include one map for the mine plan and one map for the reclamation <br />plan. The map(s) should be drawn to a scale no smaller than 1 inch = 50 feet, <br />show a north arrow and note any section corners ad,)acent to the proposed <br />operation. At a minimum, you should include the following information. <br />Mining Plan <br />1. Outline and label the permit boundaries and the affected area described in <br />Exhibit A - Legal Description. <br />2. Label the names of owner(s) of record of the surface of the affected area <br />and of the land immediately adjacent to the affected area. <br />3. Outline and label all mayor surface features to be used in connection with <br />the proposed operation such as: existing and proposed roads, pit boundary, <br />topsoil stockpiles, overburden stockpiles, product stockpiles, waste rock <br />fills, stream channels, buildings, processing plant, underground openings such <br />as adits or ventilation facilities, ponds, impoundments, diversions, tail or <br />waste disposal areas. <br />4. Indicate the direction that mineral extraction will proceed. <br />5. Note the location of arty significant, valuable,-rand permanent man-made <br />structures within 200 feet of the affected area such as: houses, barns, <br />fences, above or below ground utilities, irrigation ditches, maintained or <br />public roads, bridges, wells, pipelines, water storage impoundments, railroad <br />tracks, cemetaries, and communication antennas. A narrative description <br />should be provided in Exhibit B - Site Description. <br />6. Outline and'label existing disturbance, if any, within and ad,)acent to the <br />permit boundary (e. g., previously mined areas, roads or excavations resulting <br />from utility construction). If you redisturb areas that_.have been previously <br />disturbed, then they must be included in the permit area and addressed in <br />Exhibit D - Reclamation Plan:" <br />Reclamation Plan <br />1. Indicate the gradient of all reclaimed slopes (horizontal:vertical). <br />2. Label the location where grass, fortis, shrubs or trees will be planted. <br />3. If ponds are a part of the reclamation plan, outline the final shore <br />configuration of the ponds. <br />4. Note the thickness of replaced overburden. <br />5. Note the thickness of replaced topsoil. <br />