Laserfiche WebLink
9. Hocker Construction will follow the recommendations of the DMG and allow a <br />maximum mining highwall angle of O.SH:1 V and a 46' setback from the <br />centerline of the easements within which the gas production structures lay, and <br />46' from structures on the surface. Please see attached copy of engineering <br />evaluation. This evaluation will supersede the 60 ft. setbacks indicated on the <br />mining maps, and the 200' setback represented in Exhibit S. A revised Exhibit S <br />is attached. <br />Please contact me at (970) 259-2629 with any questions or concerns. If the adequacy <br />responses need modification, please contact me prior to rendering any fmal decision. <br />Sind ~"(Y <br />Kirk Allen <br />Agent for Hocker Construction <br />