Laserfiche WebLink
cA~PlT7AR rrrc. <br />FLEET PRODIICFIODI AND OO.SP ANALYSIS <br />ES'PIl`IATED 0DS'15 TO RRPT AC'F. TOPSOIL .A4.' SENDCA MINE <br />SENF7CP, RECL. BOND PWOC 2?~-NOV-93 Page - 3- <br />Overall Production arxi Est :unary FPC-2a1 <br />SENECA RECL. BOND <br />Fleet Course Material TONS per Sched ~ $ <br />Name Name Qty TONS Sched HY Required $ Total per TON <br /> II ~tttl 40,460 1,548 26 22,465 0.555 <br /> II cont2 48,875 872 56 48,203 0.986 <br /> P 14,390 1,931 7 6,408 0.445 <br /> P cunt 640 1,931 0 285 0.445 <br /> NN 304,680 1,038 293 252,244 0.828 <br /> ICK 13,040 2,638 5 4,250 0.326 <br /> KK coot 14,990 1,540 10 8,369 0.558 <br /> HH 53,160 881 60 51,848 0.975 <br /> HH wntl 27,930 1,126 25 21,331 0.764 <br /> HEi cont2 23,025 2,176 11 9,099 0.395 <br /> HH oont3 62,130 990 63 53,977 0.869 <br /> HEi cont4 30,780 876 35 30,196 0.981 <br />TS REPL YC)T'ATG .. 1,175,895 1,142 1,031 888,502 0.756 <br />GRADID TOTAL.. 1,175,895 1,141 :L,031 888,502 0.756 <br />.~ <br />i <br />