CATERPILLAR INC.
<br />FLEEP PRC~UCPION AND OJSP ANALYSIS
<br />ESPIMATID OJ6'15 TO REPLACE TOPSOIL AT SFNEC'A MINE
<br />SENDCA RECL. BOND PWOC 23-NOV-93 Page - 2-
<br />Overall Production aryl G1~st Summary FPC-2a1
<br />SENECA REQ,. BOND
<br />Fleet
<br />Name Course
<br />Name Material
<br />Qty TONS TONS per
<br />Schad Hr Schad Hrs
<br />Required
<br />$ Total $
<br />per TON
<br />TS REPL TOTALS .. 1,175,895 1,141 1,031 888,502 0.756
<br />Overall Production arri Cast Summary FPC-2a1
<br />SFI~IECA RDQ,. BCND
<br />•
<br />Fleet
<br />Name Course
<br />Name Material
<br />Qty BONS TONS per
<br />Schad Fir Schad Hrs
<br />Required
<br />$ Total $
<br />per TON
<br />TS REPL A 9,140 2,131 4 3,687 0.403
<br /> X 60,265 935 64 55,389 0.919
<br /> X cont. 13,670 1,224 11 9,602 0.702
<br /> T 39,405 1,149 34 29,495 0.749
<br /> DD 42,655 1,993 21 18,396 0.431
<br /> BB 111,310 1,564 71 61,201 0.550
<br /> AA 24,035 2,022 12 10,218 0.425
<br /> AA cunt 10,495 1,745 6 5,170 0.493
<br /> E 12,630 549 23 19,778 1.566
<br /> E cunt 1,590 1,234 1 1,108 0.697
<br /> O 87,185 1,064 82 70,423 0.808
<br /> O cant 9,340 979 10 8,204 0.878
<br /> LL 41,810 708 59 50,737 1.214
<br /> LL oont 71,325 1,870 38 32,786 0.460
<br /> II 6,940 1,642 4 3,633 0.523
<br />•
<br />
|