Laserfiche WebLink
CATERPILLAR INC. <br />FLEEP PRODUCTION AND COST ANAI,YiIS <br />ESI'II~IATED COSIS ~ RFDTAf'F TOPSOII, A'C SENEl:A MINE • <br />SENECF. RECL,. BODID PWOC 2:3-NOV-93 Page - 1- <br />Cost Simmlaty -- Grarri Total <br />SENECA REC[,. BOND 1,175,895 `TUNS <br /> Oust per Hour Operziting $ per <br />DquiFmient Qty Model (each twit) Houra $ Total TON <br />Loader Total: 0 0 0 0.000 <br />Haulers 4 637E 199.46 4,124 822,573 0.700 <br />Hauler Total: 4 x{,]24 822,573 0.700 <br />Support 1 14G 64.68 262 16,671 0.014 <br />1 W.WAG 182.92 262 47,148 0.040 <br />Support Total: 2 524 63,819 0.054 <br />Grand Total: 6 4,648 886,392 0.754 <br />Overall Production and Cosy= Stmu[iaxy <br />SENDQI RE1C1,. BOND <br />FPC-2a1 <br />Fleet <br />Name Course <br />Name Material <br />Qty TONS TONS per <br />Sched Hr Schad. Hrs <br />Required <br />$ Total $ <br />per TON <br />TS REPL TOTALS .. 1,175,895 1,141 :1,031 888,502 0.756 <br />GRAND TOTAL.. 1,175,895 1,141 .1,031 888,502 0.756 <br /> <br />• <br />