CATFI2PILLAR INC.
<br />FLEET PRODiJCPION AND OOSP ANALYSIS
<br />ESTIIR~TED OJSTS TO R~A~ TOPSOIL AT SENDC~1 MINE
<br />SENECA REQ. HOPID PWCC 23-NOV-93 Page - 4-
<br />Overall Productie- arri Oust Summary FPC-2a1
<br />SENFXA RECZ. BOND
<br />
<br />Fleet
<br />Name Course
<br />Name Material
<br />Qty TONS TONS per
<br />Sched Hr Sched Hrs
<br />Required
<br />$ Total $
<br />per TON
<br />TS REPL A 9,140 2,131 4 3,687 0.403
<br />TS REPL X 60,265 935 64 55,389 0.919
<br />TS REPL X Cont. 13,670 1,224 11 9,602 0.702
<br />TS REPL T 39,405 1,149 34 29,495 0.749
<br />TS REPL 00 42,655 1,993 21 18,396 0.431
<br />TS REPL BB 111,310 1,564 71 61,201 0.550
<br />TS REPL AA 24,035 2,022 12 10,218 0.425
<br />TS REPL AA coat 10,495 1,745 6 5,170 0.493
<br />TS REPL E 12,630 549 23 19,778 1.566
<br />TS REPL E cunt 1,590 1,234 1 1,108 0.697
<br />TS REPL O 87,185 1,064 82 70,423 0.808
<br />TS REPL O cunt 9,340 979 10 8,204 0.878
<br />TS REPL LL 41,810 708 59 50,737 1.214
<br />TS REPL LL cunt 71,325 1,870 38 32,786 0.460
<br />TS REPL II 6,940 1,642 4 3,633 0.523
<br />TS REPL II contl 40,460 1,548 26 22,465 0.555
<br />TS REPL II cont2 48,875 872 56 48,203 0.986
<br />TS REPL P 14,390 1,931 7 6,408 0.445
<br />TS REPL P coat 640 1,931 0 285 0.445
<br />TS REPL INN 304,680 1,038 293 252,244 0.828
<br />
<br />
|