My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135672
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:36:23 PM
Creation date
11/26/2007 3:46:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982112
IBM Index Class Name
Permit File
Doc Date
5/3/1982
Doc Name
MILLER OPEN PIT GRAVEL MINE
From
BOWMAN GEISSINGER WRIGHT & GOWER
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U lD A-SC! <br />S.C S•C ON S33 <br />li ev•~•~!. - RE CLAIMATION PL or a PROPOSED GRAVEL PIT COOP BATOR Bob Miller <br />' ~ RECORD 0 PERATOR'S DECISIONS As o sY <br />- AND PROGRESS IN APPLICATION oA _3/26/81 <br />a <br />Page 2 <br /> PLANNED APPLIED <br />FIELD MONTH LAND USE AND TREATMENT <br />N0. AMOUNT YEAR AMOUNT AND <br /> YEAR <br /> II. PLAN OF ACTION <br />Prop- 40 to 60 ac. Compl - Critical Area Planting (Practice code <br />osed tion 342) <br />Site of <br /> Min in <br /> Sloping and Shaping: All banks will be <br /> worked so that the slopes do not exceed <br /> 3:1, and where possible, 6:1 slopes should <br /> be attained. The length of the slope on <br /> the shaped areas will be properly con- <br /> trolled with level terraces constructed <br /> across the slopes. The amount of terraces <br /> needed will be based on the final slopes <br /> attained after shaping, and the spacing <br /> will be determined by applying the univer- <br /> sal soil loss equation. <br /> Diversions will be constructed above the <br /> south and east sides of the pit in order <br /> to prevent excess runoff water from flow- <br /> ing onto the shaped areas. Approximately <br /> 900 cubic yards of earth will be required <br /> to construct these diversions. <br /> Topsoil Application: Following shaping & <br /> construction of the necessary terraces, <br /> the entire treatment area will have a <br /> minimum of 6 inches of topsoil applied <br /> on the surface. The topsoil is to be ob- <br /> tained by stripping and stockpiling it <br /> before mining is started. <br /> Cover Crop: A cover crop of oats or barley <br /> will be planted after the topsoil appli- <br /> cation in order to: 1) provide quick <br /> protection from wind and water erosion, <br /> and 2) allow for proper settlement of the <br /> topsoil in the necessary places. If ad- <br /> verse conditions exist it may be necessary <br /> to plant a cover crop in two consecutive <br /> years. <br /> Fertilizing: Apply 50-pounds of available <br /> nitrogen and 50-pounds of available phos- <br /> phate per acre immediately prior to seecy'- <br /> ing the pasture and hay land species. ,/~ <br />~C <br /> ~} <br />
The URL can be used to link to this page
Your browser does not support the video tag.