My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE135185
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE135185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:55 PM
Creation date
11/26/2007 3:10:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 14 MINE PLAN PERMIT REVISION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 11/85 <br />• will be extracted during the first year (1982). Also, there will be a <br />gob disposal area established within the old works of the C Coal Seam <br />near this first east panel. This gob area will be established to dump <br />rock and waste material cleaned up in the old entries of the Edwards <br />Mine and also for other development work, gob work, etc. that may have <br />to be accomplished during the life of the mine. <br />Development of the main five (5) entry system will be continued during <br />the second year of operation for an additional 2;000 feet. Panel <br />development will begin off the main entries as shown on the Mine Plan <br />Map (Map 9). <br />In year 4, mining and development will proceed west from the D-052504 <br />lease into the C-0117192 lease. The second west sub-main will be <br />developed during the 4th and 5th year proceeding to the westernmost <br />boundary of the permit area (approximately 2,300 feet). Development of <br />the 2nd right and 3rd right panel entries will begin off the main entry <br />. as shown on the Mine Plan Map (Map 9). Mining will be conducted in this <br />area during Years 4 through 6. <br />During year 6, the south main will be extended approximately 1,4000 feet <br />to allow development into the 4th east and 3rd west panels. Retreat <br />mining will begin in the first west panels. <br />As retreat mining is completed in panels off the 1st west sub-main, this <br />area will be sealed off entirely for fire protection and ventilation <br />efficiency. <br />In Years 7 through 12, the 3rd west sub-main will be developed to the <br />westernmost boundary of the permit area, approximately 3,300 feet. From <br />the 3rd west sub-main, the 1st right and 2nd right panel entries will be <br />developed. Barrier pillars for support, ventilation control, and fire <br />protection will be left as shown on the Mine Plan Map (Map 9). <br />In approximately Year 11, the 1st left panel entry will be developed off <br />the 3rd west sub-main. <br />-20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.