Laserfiche WebLink
APPENDIX 2.05.4-5 (Continued) <br />• <br />Cost Breakdown (continued): <br /> b. Cost <br /> (1) eackfitl and grading <br /> 10,000 cy @ 51.50/yd S 15,000.00 <br /> (2) Topsoil - 1,000 cy @ 51.50/yd 1,500.00 <br /> (3) Mulch - 1 ton @ 5425.00/ton 425.00 <br /> (4) Fertilizer - 200 lbs @ 5.75/lb 150.00 <br /> (5) Revegetation - 225 lbs @ 516.00/lb 3,600.00 <br /> Total Storage Area Costs 20,675.00 <br /> 4. Sediment pond construction/removal/topsoilin g <br /> Two sedimentation ponds and two sedimentatio n <br /> traps were constructed <br />• a. Equipment <br />Cat D-8H dozer <br /> 4-yard front-end loader <br /> b. Cost <br /> (1) Northwest sediment trap construction <br /> Excavation: 150 cy @ 52.00/cy S 300.00 <br /> (2) Berm construction: <br /> 175 cy @ 53.00/cy 525.00 <br /> (3) Riprap outlets: 4 cy @ 525.00/yd 100.00 <br /> (4) Sediment Ponds No. 1 8 No. 2 <br /> (Map 10) Excavation: <br /> 4,800 cy @ 51.00/yd 4,800.00 <br /> (5) Key way construction: <br /> 850 cy @ 55.00/yd 4,250.00 <br /> (6) Core compaction: 91 ft @ E3.00/ft 273.00 <br /> (7) Outlet pipe materials: <br /> 45 ft @ E26.00/ft 1,170.00 <br /> 46 ft @ 524.00/ft 1,104.00 <br />• <br /> (8) Compacted fill: 4,500 ft @ 51.00/ft 4,500.00 <br />- 361 - (Rev. 5/86) <br />