Laserfiche WebLink
APPENDIX 2.05.4-5 (Continued) <br />• Cost Breakdown (continued): <br />a. Equipment <br />Cat 631C - 30 cy capacity - <br />primary dirt work, shaping <br />Cat D-8H dozer - scrapers <br />Cat 14G grader <br />Case 580 backhoe <br />966 C loader - 4 cy capacity <br />b. Cost <br />(1) Backfilled Area <br />Scrapers @ E.80/yd x 620,061 yds E496,049.00 <br />(2) Hau] Road Reclamation <br />Scrapers @ 51.50/yd x 2,400 yds 3,600.00 <br />(3) Clearing and grubbing 2,000.00 <br />Total Backfiiling Costs $501,649.00 <br />• 2. Topsoil pit (plus T/S sampling) <br />Assuming 80,000 BCY to be spread <br />a. Equipment <br />Cat 631C scraper <br />Cat DSH dozers <br />b. Cost <br />(1) Respreading: <br />80,000 cy @ $.68/cy $ 54,400.00 <br />(2) T/S Sampling: Sampler/worker 150.00 <br />(3) Lab Analysis: 9 samples x $100 ea. 900.00 <br />Total T/S Cost 55,450.00 <br />3. Explosive storage area reclamation <br />a. Equipment <br />Cat 631C scraper <br />Cat D8H dozers <br />• <br />- 360 - (Rev. 5/86) <br />