Laserfiche WebLink
APPENDIX 2.05.4-5 <br />• RECLAMATION COST - ACTUAL COST TO PERFORM RECLAMATION <br />MINED AREA <br />SUN COAL COMPANY - MEADOMIS N0. 1 <br />ROUTT COUNTY, COLORADO <br />Bond Components: <br />A. Geotechnical/planning studies <br />B. Earthwork <br />Backfilling/leveling/scarification <br />Topsoiling pit (plus 7/S sampling) <br />Explosive storage area <br />Sediment pond construction/removal/ <br />topsoiling <br />C. Revegetation <br />Fertilization <br />Seeding <br />Mulching <br />D. Fencing <br />• E. Diversion ditch construction <br />F. Restoration and cleanup <br />Subtotal <br />G. Administration 10~ <br />TOTAL <br />Cost Breakdown: <br />A. Geotechnical <br />B. Earthwork <br />1. Backfill and grading <br />500,927 cubic yards of overburden were <br />replaced; 2,400 cubic yards were graded to <br />restore the haul road within the permit <br />area <br />• <br />E501,649.00 <br />55,450.00 <br />20,675.00 <br />18,672.00 <br />5,250.00 <br />22,720.00 <br />29,750.00 <br />E -0- <br />596,446.00 <br />57,720.00 <br />9,025.00 <br />7,800.00 <br />2,500.00 <br />723,491.00 <br />72,349.00 <br />E745,840.00 <br />E -0- <br />- 359 - (Rev. 5/861 <br />