Laserfiche WebLink
<br /> <br />e) RECLAMATION SCHEDU~.E <br />PHASEIAREA ACTIVITY TIMEFRAME <br />INITIAL PHASE! <br />South-Central Stack- Transfer overburden stockpile to worked-0ut West Prior to spring-2001 <br />pile - 0.8 acre excavation highwalls resumption of <br /> excavation activities <br />5.5!1.5 ac Strip 8 stockpile topsoil from excavation areas & Prior to spring-2001 <br /> NW depression disposal area resumption of <br /> excavation activities <br />N-wan ts4o~ r ~ z5' x 2) = place stripped overburden to reduce slopb of On-going, w/ spring- <br />0.76 /1.50 ac completed steep excavated headwalls, excess to 2001 to Yr-2003 <br /> NW disposal depression. completed south and <br /> west excavation <br /> headwalls <br />SECONDARY PHASE <br />5.16/1.50 ac Strip & stockpile topsoil from excavation areas & Prior to spring-2003 <br /> more of the NW disposal area resource excavation <br />w-wau tssa x i ~.s x z) = Place stripped overburden to reduce slope of Prior to spring-2003 <br />0.5211.50 ac completed steep excavated headwalls, exces's to resource excavation <br /> NW disposal depression ' <br />North Central Stock- Transfer pre-existing overburden stockpile' to Prior to Year-2005 <br />pile -- 1 ac disposal NW depression or to ball stieep completion of the <br /> excavated headwalls final east 430 feet of <br /> Seconda Exc. <br />TERTIERY PHASE <br />5.14/1.5 ac Strip & stockpile topsoil from excavation areas 8 Prior to spring-2006 <br /> more of the NW disposal arse resource excavation <br />NW disposal Place stripped overburden to reduce slope of Prior to spring-2006 <br />depression/-3 ac completed steep excavated headwalls, excest; to resource excavation <br /> NW dis sal de ression <br />RESTORATION Topsoil 2:1 headwall slope-banks FollowingYr-2006± <br />PHASE depletion of all permit <br /> area sand & gravel <br /> resources <br /> Rip-loosen pit floorlterrace bench(s) Upon Yr-2008-2009± <br /> removal of all product <br /> stockpiles <br /> Fertilize, seed, & mulch all disturbed, topsailed July Yr-2009± <br /> areas <br />No surface water accumulation ponds, buildings, nor roads shall remain on the site following <br />mining and reclamation (except for the pre-existing main access rgad from the county road to the <br />permit area north boundary). Ponds built jor pumped water sto{age shall remain in place in <br />the northeast area of the reclaimed pit jor continued ranch~use in off-site Irrigation. <br />Storm water outfall controls at the northeast comer of the site shad remain until re-vegetation is <br />adequate for permit termination. No waste material nor overbur(en stockpiles shall remain in <br />the reclaimed site. <br />n <br />1R <br />