Laserfiche WebLink
J <br />• <br />sheet 1 of 2 <br />CIRCES Cost Estimatincl Software <br />SCRAPER TEAM WORK <br /><< <br />~~~ ~;~ <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDMG <br />Task # : 075 State :Colorado Penn~ob # : C-1980-005 <br />_ <br />Date : 12/01/2005 County :Routt _ <br />Abbreviation :none <br />User : SLB Site :Seneca li Mine Filename :0005-075 <br /> <br />Permit or other job action :Technical Revision 37 <br />Task description :Topsoil deadhead routes (SCC TAsk DH-1) <br /> <br /> _ ~ i I ~'~ ' ~: ~' ~; r gg ' <br />~i Ri i .. <br />HOURLY EQUIPMENT COST <br /> Shift basis : 1 per day <br /> Equipment Description <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Water truck :Water Tanker, 10,000 Gal. <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader :CAT 14H <br />Cost Bre <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctmk <br />Utilization-machine : 100 NA NA NA 100 100 <br />-Ripper attachmerrt : NA NA NA NA NA NA <br />Ownerhip cosUhour : $76.44 NA NA NA $34.94 $56.94 <br />Operatingcost/hour: $166.38 NA NA NA $42.36 $93.74 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cosUhour : $32.15 NA NA NA $31.97 $21.16 <br />Unit subtotals : $274.97 NA NA NA $f09.27 $171.84 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1, 099.87 Support : $0.00 Maintenance : $281.11 <br />Tatal work team costlhour: $1,380.99 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 54,361 LCY factor <br />Loose <br />NA volume : 34,361 <br />LCY <br />• Source of quantity take-off :SCC Task DH-1 <br />Source of estimated swell factor : NA <br />z; <br />/3-/- /~3 <br />_ ~' ., - <br />