My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134366
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:35:04 PM
Creation date
11/26/2007 2:12:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
3/27/2007
Section_Exhibit Name
Tab 13 Attachment 13-1 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />• Hauling Cauacity <br />Scraper Payload (weight) Basis <br />Material weigh : 2,075 pounds/LCY <br />Material description <br />USER-PROVIDED WEIGHT DATA <br />Rated payload : 75,000 pounds <br />Payload capadry : 36.14 LCY <br />• <br />Travel time <br />Road condkion description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul Route <br />Bowl (volume) Basis <br />sheet 2 of 2 <br />C}i <br />Struck volume : 21.00 LCY <br />Heaped volume : 31.00 LCY <br />Average volume : 26.00 LCY <br />Adjusted capacity : 26.00 LCY'** <br />production mflegs volume perscraper pare onpush-pull motlels <br />Cycle Time : ob Condition Corrections : Stte akr[ude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading lime ' : 1.00 minutes Attitude adj. : 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />• road time per scraper pair on push-pull models Net COrreCttOn : 0.830 NA <br />Seg. # Haul distance (feet) Grade (%) Rolt. res. (°~) Total res. (%) Vebcky (fpm) Travel time (min.)** <br />1 1,000 5.00 5.00 10.00 922 1.11 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Retum route <br />Haul time : 1.11 minutes <br />"travel time for each segment is adjusted for acceleratioNdeceleradon, Retum time : 0.45 minutes <br />table velocities are max. adainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.16 minutes <br />Unadjusted unit production/hour : 987.70 LCY/hour "`* Adjusted forjob condkions : 819.79 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (untt) houry production : 819.79 LCYktour <br />Adjusted multiple scraper team (fleet) hourly production : 1, 639.58 LCY/hour <br />• JOB TIME AND COST <br />Fleef size : 2 Team(s) <br />Unit cost : $0.842 /LCY <br />.. i! ~ <br />Total job time : 33.96 Hours <br />Total job cost : $45,787 <br />i3-l-i/~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.