Laserfiche WebLink
CIRCES Cost Estimating Software <br />• MOTOR GRADER WORK <br />~a i< G: ~ r::~ <br />Task # : 074 <br />Date : 12/01/2005 <br />User: SL8 <br />State :Colorado <br />County : Routt <br />Site :Seneca !i Mrne <br />• <br />Agency or organization name : CDMG <br />Permit or other job action :Technical Revision 37 <br />Task description :Shape excess gray <br />HOURLY EQUIPMENT COST <br />onto <br />Permitlob # : C-1980-005 <br />Abbreviation :none <br />Filename :0005-074 <br />roads (SCC Task PR-2) <br />~~ ~. <br />1 ~ .., ~' '! R . .'~ <br />Basic machine :CAT 14H Horsepower ; 215 <br />Attachment no. 1 : NA Shift basis ; 1 per day <br />Attachment no. 2 : NA <br /> Data source ; (CRG) <br /> tftilQatlOn <br />Cost Breakdown Ownership cosVhour : $34.94 NA <br />Grader operating cost/hour : $42.36 100 <br />Ripper operating cosNhour : $0.00 NA <br />Operatorcostlhour: $31.97 NA <br />Total unit cosUhour : $109.27 Total fleet cosUhour : $109.27 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 107.00 acres <br />Source of estimated acreage :Table 13-2-5 <br />• <br />HOURLY PRODUCTION <br />Selected application :Grading <br />Average grader speed : 1.00 mph <br />Selected blade angle : 15 degrees ~ `at 0 degrees, Wade is perpendicular <br />Effective blade length : 13.00 feet to direcM1On of Vavel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 11.00 feet " "' widU of ripper beam on dppirg appFwtions <br />Unadjusted hourly unit production : 1.3333 acres hour <br />Job Condition Correction Factors Source <br />Average site attitude : 7, 500 feet Altitude adjustment factor : 1.00 ~ (Cat HB} <br /> Job efficiency adjustment factor : 0.80 (1sh/d, adv.) <br /> Net job correction : 0.8000 multiplier <br />Adjusted houdy unit production : 1.0667 acres/hour <br />Adjusted houdy fleet production : 1.0667 acres/hour <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 grader(s) <br />$102.44 per acre <br />Total job time : 100.31 hours <br />Total job cost : $10,961 <br />/3-/-/~z <br />