Laserfiche WebLink
,, ~, _ ORADO NIHED LAND AECLANATION DIVISION <br />PILOT TRUC[ COST DATA YOR[SHEET Sheet i of 2 sheets REfEREHCfS: 1) COST REIEAEHCE GUIDE <br />................................ 21 CONTRACTORS EGUIPHEHT COST GUIDE <br />REYISIOH DATE: 8/92 3) COLORADO CONTRACTORS ASSOCIATION <br />""""""""" YAOE RATE SCHEDULE <br />YOR[SHEET FILENAME: PILOT-T[.Y[1 <br />MACHINE DESCRIPTION: OH-HICHNAY LIOHi DUTY TRUC[ - GASOLINE, 4x2, 1/2 TON, 130HP <br />COST ADJUSTMENT FACTORS BASE YALUE ADJUSTED YALUE <br />Acquisition Cost: 511,200.00 58,289-SB <br />Econooic Life Nours: 1000 9000 <br />Annual Use Hours: 2112 2000 <br />Mech. Labar Cost-lone 1: 524.78 521.95 <br />-Zane 2: 524.78 521.95 <br />Fuel Cost Per gal.: 51.12 51.14 <br />Lube Cost: 50.35 50.35 <br />Tire Life Nours: 2000 1650 <br />Tire Purchase Price: 3380.00 5280.00 <br /> --- BASE ONHERSNIP 6 OYERNAUL COSTS ----.- ---------------BASE OPERATING COSTS --- ----- --- <br />BASIC MODEL S ATTACNHENTS ~ DESCRIPTION ; DEPRECIATION OHD/CFC LABOR PARiS~ LA80R PARTS FUEL LUBE TIAES G.E. C. <br />Machine Model Ho. :1/2 T. 4x2 LT.DUTY 51.48 50.45 50.32 50.29 50.40 50.24 52.17 50.98 50.19 50. 00 <br />Attach~ent [1 H/A 50.00 50.00 50.00 50.00 t0.00 50.00 50.00 50.00 50.00 50. 00 <br />Attach~ent 12 N/A 50.00 50.00 50.00 50.00 50.00 10.00 50.00 50.00 50.00 50. 00 <br />Attach~ent S3 <br />-------------------------- N/A <br />-------------------- 50.00 <br />--------------- SO.00 <br />---------- 20.00 <br />---------- 10.00 <br />------ 50.00 <br />------ 50.00 <br />------- 50.00 <br />-------- 50.00 <br />-------- 50.00 <br />-------- 50. <br />---- 00 <br />---- <br />BASE COS1 SUBTOTALS 51.48 50.45 50,32 50.29 50.40 50.24 52.77 50.98 50.19 50 .00 <br /> -- ADJUSTED ONNERSNIP d OVERHAUL COSTS -~- -------- -- ADJUSTED UPERATIN6 COSTS --- -------- <br />COST ADJUSTMENT <br />---------------- FACTORS <br />--------- ~ FACTOA VALUE ~ <br />-------------------- DEPRECIATION <br />--------------- OHD/CFC <br />----------- LABOR <br />------ PAATS~ <br />------ <br />-- LABOR <br />--- <br />--- PAATS <br />--- <br />--- FUEL <br />-- <br />- <br />--- lUBE <br />------- TIRES <br />-------- G.E.C. <br />-------- <br />Acquisition Cost 0.7401 51.10 H/A - <br />N/A - <br />N/A - <br />- <br />H/A - <br />- <br />N/A - <br />- <br />H/A N/A H/A N/A <br />Econo~ic Life 0.7778 50.85 N(A 50.25 50.23 50.31 50.19 H/A H/A NJA HJA <br />Annual Usage 1.0560 51.16 50.48 N/A N(A H/A NjA N/A N/A NjA N(A <br />Double shifts .750depr.-.SOOoI~d S0.8i 50.24 N/A H/A N/A N/A N/A N/A H(A H/A <br />triple Shifts .667depr.-.333o1id f0.i7 f0.16 N/A NJA N/A H/A N/A N/A H/A H/A <br />Hechar~ic Cost - lone 1 0.88E.0 H/d H/A 50.22 H/A 50.28 N/A N%A N/A H/A X/A <br />- Zone 2 0.6860 N(A N/A 50.22 HJA 20.29 HJA H/A N/A HJA N/A <br />Fuel/LubeJiire Cost Variable H/A H/A N/A N/A H/A H/A 52.82 50.99 50.23 50.00 <br />Truck Util. - tone ] 100.001 N/A N/A 50.22 50.23 S0.2A S0.J9 S2.R2 50.99 50.23 20.00 <br /> - lone 2 100.00I N/b H/A SU.22 50.23 50.28 50.19 52.62 50.99 50.23 50.00 <br />STED COST SUBTOTALS -S.SHIFT -ZONE A: Sl. lb 50.48 f0.22 50. 23 50. 28 50. 19 52.82 50.99 50.23 50.00 <br />-10NE B: 51. 16 S0. 4F 50. 22 20. 23 20. 28 50. 19 52.82 50.99 50.23 50.00 <br />-G.SHIFTS-ZONE A: f0. 87 SO. 24 50. 22 50. 23 t0. 28 50. 19 52.82 50.99 50.23 50.00 <br />-ZONE B: 50. 87 50. 24 50. 22 50. 23 50. 28. 50. 19 52.82 50.99 50.23 50.00 <br />-T,SH[FTS-ZONE A: 50. 71 50. 16 20. 22 50. 23 30. 28 50. 19 S2.S2 50.99 50.23 50.00 <br />-1OHE e: SU. 77 50. 16 50. 22 50. 23 50. 28 50. 19 52.82 50.99 59.23 59.00 <br />._~ <br />