My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134219
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:55 PM
Creation date
11/26/2007 2:01:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
4/14/1995
Doc Name
HORVATH PIT 1 PN M-77-546 ENCLOSED BOND RECALCULATION
From
DMG
To
BRICE F AND PHYLLIS J LEE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ .... .~ <br />PILOT iRUC[ COST DATA NORZSHEET cont'd Sheet 2 of 2 sheets <br />OPERATOR WAGES <br /> Fringe F.LC,A Une~pl. Nk.Coop. <br />Labor Classification Zone Designation Base Rate Benefits (O.Oi10) (0.062) (0.125) Total ~ Shift Differential (5/hr1 <br /> <br />Truck Operator Zone A SL3.08 53.49 SE.O1 50.81 Si.6A 520.02 ~ Day shift: 50.00 <br /> lone B 513.58 53.49 51.05 50.84 f1.70 520.66 . Sxing shift: 50.36 <br />Fore~an tone 1 215.60 53.50 51.20 50.91 51.95 523.22 ~ Graveyard shift: t0.45 <br /> Zone 2 515.60 53.50 51.20 50.97 51.95 523.22 . - ------- <br />Hechanic Zone 1 514.60 53.50 51.12 50.91 51.83 221.95 ~ 2 shift/daY avg. 50.15 <br /> Lone 2 214.60 53.50 51.12 50.91 SI.83 521.95 ~ 3 shift/day avg. 50.25 <br />ACOUISITIOH COST: <br />Base purchase price (CECG) <br />Less dealer discount (CECG @ ISI} <br />Plus freight (CECG @ N/A} <br />Plus dealer charges lassu~e .3I) <br />Adjusted purchase price <br />Plus tares: Slate sales @ 3Z <br />SHM @ 2Z <br />Less lire cost (CECG} <br />less salvage value (CECG @ ]5.3I} <br />NET ACOUISITIUN COST <br />-------------- <br />COST SUNHARY <br />Oxnership Cost/Hr: <br />operating-Overhaul Cost.JHr; <br />Operator Cost/Hr. <br />10TA1 COST/HR <br />511,200.00 <br />51,680.00 <br />50.00 <br />533.60 <br />59,553.60 <br />5286.61 <br />5191.Oi <br />f280.00 <br />51,461.70 <br />58,289.58 <br />SINGLE SHiFI DOUBLE SHIF1 TRIPLE SNIFT <br />BAS IS BAS IS BASIS <br />Zone 1 lone 2 Ione 1 lone 2 Ione 1 lone 2 <br />51.63 SI. E•3 SI.11 SI.II 50.93 50.93 <br />Sd.9S 54. 95 54.95 54.95 54.95 54.95 <br />s2D.oz sza .66 szo.17 szo.E:l szo.zi s2o.91 <br />526.61 S2i .24 526.23 52E•.86 S26.I5 526.79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.