Laserfiche WebLink
l.~: .. .. .~~ <br />~ _ r ~ • • <br />FLATBED TRUC( COST DATA YOA(ST~ET cont'd Sheet 2 of 2 sfieets <br />OPERATOR YA6ES <br />Lahar Classification Zone Designation Base Rate <br />Multi-purpose Truck Drirer Zone 1 113.22 <br />Zone 2 113.72 <br />Mechanic Zone 1 514J1 <br />Zone 2 515.21 <br />Fringe F_I_C.A Iloeipl. Yk.Ca~p. ~ <br />Benefits (0.0770) (0.062) (0.125) Total ~ Shift Differential (5/hr) <br /> <br />13.49 11.02 50.82 11.65 (20.20 ~ Dal shift: (0.00 <br />13.49 11.06 10.85 11.72 (20.83 ( S~iog shift: (0.30 <br /> Graveyard shift: (8.45 <br /> <br />(3.49 (1.13 18.91 11.84 (22.88 ~ 2 sfiift/daf arg. =0.15 <br />53.49 11.17 10.91 (1.90 122.72 ~ 3 sfiift/daY avg. (0.25 <br />ACQUISITION COST: <br />Base purchase Price (CECG) 532,065.00 <br />Less dealer discount (CECG ! 2.2i) (705.43 <br />Plus freight (asswe 1.SZ) 5400.91 <br />Plus dealer charges (assa~e .3Z) 596.20 <br />............... <br />Adjusted purchase price 531,936.14 <br />Plus taxes: State sales ! 3Z 595!.10 <br />SMM ! 2I 5638.13 <br />Less fire cost (CEC6) 51,859.71 <br />Less salvage ralne (CEC6 ! 152) 54,790.51 <br />NIT ACQUISITION COST 526,883.30 <br />COST SUMMARY <br /> SINGLE SHIFT DOUBLE SNIFT TRIPLE SHIFT <br /> BASIS BASIS BAS IS <br /> Zone 1 Zane 2 Zone 1 Zone 2 Zane 1 Zane 2 <br />Omership Cast/Hr: SSJ3 55.73 53.78 53.78 53.13 53.13 <br />Operating~rerhaul Cost/Hr: 51.42 57.46 57.42 51.46 57.42 57.46 <br />Operator Cost/Nr: 520.20 520.83 520.35 520.98 520.45 521.08 <br />TOTAL COST/HR . 533.35 534.02 531.55 (32.22 531.00 531.61 <br />