Laserfiche WebLink
- ---- -----._-----__.~-_v.~ <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTINATIN6 FORM -EQUIPMENT MOBILIZATION / DENOBILIZATION <br />-------------------------------------------------------- <br />--------------------------------------------------------- <br />Task {... 4 Prep. Dy SSS Filena~e..M546-4 <br />Date..... 14-APr-95 Penit S M-7)-546 Hine......Horvath Pit No. 1 <br />Pereit Action........ General 110(2) type peroit bond recalculation <br />Task Description..... Transport equipoent to/frog site <br />...\ .........................a,.........,,...a...,.........,..4......................a.• <br />HOURLY EAUIPMENT COST <br />_____________________ NOTE - This is a list to select frog, not a list of Mandatory ite~s to include. <br />Hob/Oe~ob Eqp. -tractor : 6x4, 75,000 lb 6VN, 315 HP, diesel powered <br /> -Lt. Trailer : 25 ton folding gooseneck, drop deck <br /> -Ned. Trailer : 50 ton folding gooseneck, drop deck <br /> -Hvy, frailer : 120 ion folding gooseneck, drop deck <br /> -Pilot Car : On-highway light duty truck, 4x2, 130 hp, 1/2 ton rating, gasoline powered <br /> -Hyd. Crane : Grove ATSBD rough terrain hydraulic crane, 20 ton capacity, 125 hp, 60 ft. boos <br /> -Fuel Truck : 6z4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Lobe Truck : 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 20,000 lb 6VN, 115 HP, diesel powered <br />Last Update: ..................................................................................... <br />Nay, 1991 <br />""""""" " Lt. Rig Med.Rig Hvy.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: (=25 T. 26-50 T. ) 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = 526.78 229.16 (31.74 51.39 519.89 36.02 510.66 56.70 <br />Operating Cost/hr = 523.23 524.76 529.92 f4.05 523.40 316.19 520.11 57.47 <br />Operator Cost/hr = 520.54 520.54 520.54 519.81 (20.86 519.97 519.91 519.97 <br />Helper Cost/hr = 519.01 <br />------- (19.81 519.81 50.00 50.00 <br />------- ------- ------- <br />------ 50.00 <br />--- SD.00 <br />- SD.00 <br />-- <br /> <br />Total <br />= 590.36 - <br />594.27 5108.01 525.25 564.15 - <br />--- <br />542.18 ------ <br />551.34 ---- <br />- <br />534.14 <br />NON-AOADABLE EAUIPMENT <br />"""""""""""" Height Ownership Haul Rig Fleet Size Naul Trip Return Trip DOT Per~it <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />---------------------------------------- <br />CAT D9L 58.40 ----------- <br />548.49 ------------ <br />2108.01 - --------------- <br />1 5156.50 -------------------------- <br />5108.01 <br />Revegetation equip~ent 20.00 520.00 290.36 1 5110.36 590.36 <br />------------------------------------------------------------------------------------------------------------------- <br />Subto2als : 5266.86 5198.37 50.00 <br />