My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE134219
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE134219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:55 PM
Creation date
11/26/2007 2:01:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
4/14/1995
Doc Name
HORVATH PIT 1 PN M-77-546 ENCLOSED BOND RECALCULATION
From
DMG
To
BRICE F AND PHYLLIS J LEE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ROADABLE EAUIPNENT: <br />Machine Description <br />--------------------- <br />--------------------- <br />Flatbed truck <br />Total Eqp. Fleet Site Haul Trip Return Trip <br />Cast/hr (no. hauled) Cost/hr Cost/hr <br />534.02 1 534.02 534.02 <br />MOB/DENOB SUPPORT EAUIPNENT: <br />"""""""""""""" Height Ownership Haul Rig <br />Non-Roadable Eqp. Description (tons) Cast/hr Cost/hr <br />------------------------------------------------------------ <br />sheet 2 of 2 <br />----------------------------------------- <br />----------------------------------------- <br />Subtotals : 534.02 534.02 <br />fleet Size Haul Trip Return Trip DOT Pereit <br />(no. hauledl Cost/hr Cost/hr Cost/ea <br />------------------------------------------------------ <br /> Subtotals : 50,00 50.00 50.00 <br /> Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description <br />----------------------------- <br />-------- Cost/hr <br />------------------- (na. hauled) <br />------------------ Cost/hr <br />----------- <br />------ Cost/hr <br />--------- <br />------------------------------- <br />Pilot car -------- -------------------- <br />52).24 ------------------ <br />2 ----------- <br />554,48 ------ --------- <br />(54.48 <br /> Subtotals : 554.48 554.48 <br />EAUIPNENT HAUL DISTANCE A TIME <br />Nearest eajor city or town within project area region: Durango <br />Total one way travel distance = 15.0 eiles. Average travel speed = 35.00 eph. <br />Job Tiee - Non Roadable Equip. = 0.50 hours load Roadable Equip.= N/A hours load <br /> 0.43 hours haul 0.43 hours haul <br /> 0.50 hours unload N/A hours unload <br /> 0.43 <br />------ hours return <br />--------------- 0.43 <br />-------- hours <br />------ return <br />-------- <br />JO8 COST <br />--------- <br />--------- To tal Mob/Deoob Cost = 51,055.04 <br />------------- <br />------------- <br />NOTE: Non-roadable equipeent (haul rig required to transport) eob/deeob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way eepty return. Roadable equipeent (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special pereits for oversize equipeent on certain <br />specified road segeents within the State, Separate pereits are required for each rig on each loaded trip. <br />Additionally, pilot. cars Lone or two per rig depending on degree of oversize) are also required for oversize <br />equipeent hauling, and loading/unloading [ices Bust he increased substantially for equipeent which cost be <br />partially diseantled for transport and re-asseebled at the job site. Costs for lifting equipeent and other <br />support equipeent needed for this work should be included in the eob/deeob costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.