Laserfiche WebLink
ESTIMATING FORM - REYE6ETATION NOR• t'd Filenaee : M546-3 sheet 2 of 2 <br />B. SHRUB i TREE TRANSPLANTS <br />=-_=:=_-__:=__-==____:_=____ MATERIAL:. PLANTING: f/PERT. ; TOTAL ~ TOTAL <br />SPECIES NAME AUAN./ACRE ) STOCI TYPE 6 SIZE S/PLANT S/PLANT PELLET i 5/PLANT 5/ACRE <br /> <br />No transplants required 50.00 <br /> , ~ ~ ~ i <br /> , i ~ ~ <br />, , ~ ~ ~ <br />~ , <br />i <br /> , ~ ~ ~ <br />, ~ i ~ , <br />~ , <br />, <br /> , <br />i ~ ~ <br />~ <br />~ , <br /> , , , <br />, <br /> , ~ <br />, , ~ , <br /> <br /> Total t ransplant cost/acre: 50.00 <br />C. SEEDBED PREPARATION <br />----------------------- -=- =_===_-_- <br />----------------------- <br />Tilling eethod tl: <br />harrowing <br />526.00 <br />t2: <br />D. SEED APPLICATION <br />-------------------- Total Cost/acre: <br />--- (26.00 <br />--------- <br />-------------------- <br />Seeding eethod: <br />drill seeding <br />Total --- <br />cost/acre: --------- <br />548.00 <br />E. FERTILIZING <br />--------=---=-= FERTILIiER / SOIL AMENDMENT UNITS/ACRE ~ UNIT S/UNIT ~ f/ACRE <br /> <br />Materials used tl: potassiue nitrate (13-46-0) ~ 100.00 ~ pound ~ f0.58 ~ SSB.OD <br />t2: <br />, <br />' <br />!3: ' ' <br /> <br /> Total eaterials cost/acre: 558.00 <br />Application eethod tl: tractor drawn broadcast spreader SIS.OD <br />t2: <br /> Total application cost/acre: 515.00 <br />F. MULCHING - <br /> NULCH / NETTING / OTHER NATERIALS ~ UNITS/ACRE UNIT ~ S/UNIT ~ S/ACRE <br /> <br />Materials used tl: straw (delivered) - tors 1.00 . tan ~ 560.00 ~ 560.00 <br />t2: <br />t3: ' <br />t4: ' ' ' <br /> Total eaterials cost/acre: 560.00 <br />Application eethod I1: power eulcher (at 2 tan/acre rate) 5139.00 <br />t2: crisping (with tractor attacheent) 533.00 <br />t3: <br /> <br />6. JOB COST <br />total area to be seeded: 9.80 acres. <br />Estieated failure rate: 20.OOZ of area <br />Total application cost/acre: 5112.00 <br />Total S/acre 5404.32 Total Initial Job Cost= 53,962.38 <br />-------- ------------ <br />--------- ------------ <br />Total S/acre+ : 5404.32 Total Reseeding Costs = 5792.48 <br />+ Reseeding cost itees: A C D E F GRAND TOTAL JOB COST = 54,754.86 <br />