My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133830
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:31 PM
Creation date
11/26/2007 1:40:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Permit File
Doc Date
12/9/1983
Doc Name
ANDESITE ROCK CO LYONS QUARRY AMENDMENT FN 77-141 NOVEMBER 29 1983 LETTER
From
RINDAHL & ASSOCIATES
To
MLRD
Section_Exhibit Name
EXHIBIT A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
La. TOpsOil and Over tr den stoc{;pyle loc at.y ons <br />the revised mi ~q map. A co ~~ rte`°`°d "'~ <br />py Of the ap has berm <br />furnished to the andowner. <br />~. Noted. <br />f. The ponds will remain in accordance ~•,ith the currently <br />approved reclamation plan unless a change is mutually <br />agreed upon by the landowner and the operator. <br />g. The operator hzs not channelized the river. Nor.e of the <br />mining operations will cause increased depth and rate of <br />flew of the river, erosion or disturbance of irrigation <br />diversion structures. The river course was r.ot changed by <br />the mining operator. P.iprapping has been provided in a <br />minimal amount and only to protect the river back from <br />sericus erosion. The current lease hold=_ the landowner <br />harmless from damage caused by the operator. <br />h. All areas are included in the reclamation plan and the plan <br />map. <br />i. The operatcr concurs in reclamation of any area disturbed <br />by the mining operation. <br />j. The operator concurs to grade the area to allow drainage <br />Generally in the downstream direction. <br />k. The operator will coordinate with the landowner prior to <br />the siting and construction of new roads. Foods <br />constructed far the mining operation will be reclaimed in <br />the same manner as other areas of disturbance. <br />1. The mining timetable is contained in the first page of the <br />mining plan. Areas will 6e mined in the order of 1, .2, 4, <br />and 3 unless a different order is agreed to by the operator <br />and landowner. <br />m. The "cresent points". on the eastern portion will be left ae <br />is. The one near the center of the area, will 6e graded <br />out to conform to the final topography. This was discussed <br />6y the la.^.dewner and operator on a site visit. BntM <br />parties agreed. <br />12. a. The operator intends to approach the landowner to discuss <br />different or charges in water useage and rights which may <br />vary from past u~eage. The operator has been using this <br />water for the past ten year=_ with the knowledge of the <br />landowner. <br />b. There are no retention ponds within the permit area. <br />c. The operator has been using this water for the past ten <br />years with the knowledge of the landowner. <br />J <br />& Environmental Services <br />~/ ! _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.