My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133830
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:31 PM
Creation date
11/26/2007 1:40:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Permit File
Doc Date
12/9/1983
Doc Name
ANDESITE ROCK CO LYONS QUARRY AMENDMENT FN 77-141 NOVEMBER 29 1983 LETTER
From
RINDAHL & ASSOCIATES
To
MLRD
Section_Exhibit Name
EXHIBIT A
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />w/ 'voted <br />~c. The area referred~o as drill sites and prospecting sites <br />• are in accordance with the exception under the definition <br />of prospecting. The operator agrees to remove all rebars <br />left on site which are me.rked exploration holes. <br />10. a. The "stoc{:piles" as indicated or. ±he Pre-Mining and 1lining <br />t9ap=_ were erroneously ]at•eled. The term has been charged <br />to previous exploration sites. These sites will be <br />reclaimed as a pzrt of the amended permit. <br />h. The plant which is on site is capable of providing 40G,400 <br />tons per year when in new condition. If the market demands <br />such production. The current plant will suffice or be <br />replaced with a like size plant. <br />c. The operator agrees to consult with the landowner on a <br />regular- basis to keep him appraised of activities of <br />interest to him, as he has done in the pa=_t. <br />d. The correct acreage to be permitted is 54 acres. The <br />addition of lands disturbed as outlined in the mining plan <br />could lead to some other figure unless the person <br />performing the addition understands that some of these <br />areas overlap. <br />e. Noted. <br />f. The mining and reclamation plans include starting <br />reclamation in each area prior to the start of. reclamation <br />in new areas. <br />4. The operator intends to mine in the following order unless <br />changed by mutual agreement of the landowner and operator: <br />P.rea 1 <br />P.rea 2 <br />Area 4 <br />Area 3 <br />g. Noted. <br />ll.a, The current permit for the lower area calls for cattle <br />rangeland. It is the intent of the operator to comply with <br />this document unless a change is agreed to by both parties. <br />6. The six to twelve inches of plant growth medium is for <br />rangeland on the upland area and is considered to 6e <br />sufficient by a professional sail scientist, Mr. C. .lay <br />Silvernale, a member of the Findahl £: Associates, Inc. <br />staff. <br />c. The operator agrees to contemporaneous reclamation. <br />4 <br />& Environmental <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.