Laserfiche WebLink
CIRCES Cost Estimating Software <br />• <br /> PROJECT IDENTIFICATION <br /> Task # : 014 <br /> Date : 06/28/2004 <br /> User : JRS <br />State :Colorado <br />County : Routt <br />Site :Seneca li-W Mine <br />Permitfjob# : C-82-057 <br />Abbreviation :none <br />Filename : C057-014 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Revision 04 <br />Task description :Doze Adjacent Soufh Sage Creek Pit <br />HOURLY EQUIPMENT COST <br /> Basic machine :CatD11R-11U Horsepower: 850 <br /> Blade type :Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $112.02 NA <br /> Operating cosUhour : $188.97 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $31.83 NA <br /> Total unit cosVhour : $332.82 Total <br />~ fleet cosVhour : $1,331.29 <br /> <br />MATERIAL QUANTITIES <". J <br />, ,. <br />Initial Swell Loose <br />volume: 509,300 LCY factor : NA volume: 509,300 LCV <br /> <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor:NA <br />HOURLY~~PRODUCTION Job Condition Correction Factors ~ ~ ~ Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 1,264.9 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Loose stockpile Spoil pile : 0.90 (ssd-fc) <br /> Push gradient : 1.33 {Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 0.93 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (SYSU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.90 <br />Weight description <br />Sandstone <br />Adjusted unit production : 1137.25 LCYmr <br />Adjusted fleet production : 4,549.00 LCY/hr <br />. JOB TIME AND COST <br />Fleet size : 4 Dozers) Total job time : 111.96 Hours <br />Unit cost : $0.293 /LCY Total job cost : $149,049 <br />