My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE133807
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE133807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:34:30 PM
Creation date
11/26/2007 1:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• <br /> PROJECT IDENTIFICATION <br /> Task u : 013 <br /> Date : Ofi/28/2004 <br /> User : JRS <br />State :Colorado <br />County : Routt <br />Site :Seneca li-W Mine <br />Permit/job# : C-82-057 <br />Abbreviation :none <br />Filename : C057-013 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or otherjob action :Permit Revision 04 <br />Task description :Doze South Sage Creek Pit <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />• MATERIAL QUANTITIES <br />Initial <br />- Partially Backhll Pit <br />Basic machine :Cat D11R - 11 U <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Ownership cost/hour <br />Operating cosUhour <br />Ripper op.cosUhour <br />Operator cosUhour <br />Total unit cosUhour <br />volume : 82,000 LCY <br />Swell <br />factor <br />Utilization <br />$1,; <br />Loose <br />NA volume : 82,000 LCY <br />$112.02 NA <br />$188.97 100 <br />$0.00 0 <br />$31.83 NA <br />$332.82 TotalfleetcosUhour <br />.29 <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction FactorsSource <br />Average push distance : 100 feet <br />Unadjusted hourly production : 2,870.3 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Sandstone <br />10.00 % (~ <br />8,000 feet <br />2,550 Ibs/LCY <br />Operator skill : 0.75 <br />Material consistency : 1.20 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.90 <br />Push gradient : 1.22 <br />Altitude : 0.93 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.83 <br />Adjusted unit production <br />Adjusted fleet production <br />Horsepower: 850 <br />2379.46 <br />9,517.84 <br />(Cat HB) <br />(Cat HB) <br />(S/SUN) <br />LCY/hr <br />LCY/hr <br />• JOB TIME~AND COST <br />Fleet size : 4 Dozers) Total job time : 8.62 Hours <br />Unit cost : $0.140 /LCY Total job cost : $11,470 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.