Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinp Software <br />• <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />015 State :Colorado Permitlob # : C-82-057 <br />06/28/2004 County :Routl Abbreviation :none <br />JRS Site :Seneca li-W Mine Filename : C057-015 <br />Permit or other job action : Pemtit Revision 04 <br />Task description :Haul Facilifies Area Surface Material to Pit <br />,, <br />.. < <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />• Cost BrE <br />~MATERIAL~QUANTITIES ~~ ~ ~~~ ~ ~~ ~~ ~~~ ~ ~~ ~~~ ~~-~ ~~ <br />Initial Swell Loose <br />volume : 28,233 LCY factor : NA volume : 28,233 LCY <br />Total work team cosUhour : $1,243.81 <br />u <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer : NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :CAT 14H <br />-Water truck :Water Tanker, 10,000 Gal. <br />~akdown : Scraper Work Team <br />Scraper Dozer Support Equipmenf <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 NA NA NA grader misctruk <br />Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cosUhour : $75.83 NA NA NA $34,64 $60.62 <br />Operating cosUhour: $165.89 NA NA NA $10.65 $23.49 <br />Ripper op.cosUhour: NA NA NA NA $0.00 NA <br />Operator costlhour : $25.43 NA NA NA $24.92 $20.88 <br />Unit subtotals : $267.15 NA NA NA $70.21 $104.99 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,068.62 Support : $0.00 Maintenance : $175.20 <br />Source of quantity take-off :Page 25-1-26 <br />Source of estimated swell factor :NA <br />