Laserfiche WebLink
~~. <br /> <br />k) llelipad <br />1) Trnllerr <br />m) Compr~rror Rrcelver Tankr <br />n) Fuel Storage, Propane end Gasollna <br />o) Septic Tanks <br />p) Adits and Declines <br />q) Storage Buildings <br />r) Major pipes and culverts not necessary for access road stability. <br />The following are the anticipated costs for Cotter Corporatiai to re- <br /> <br /> <br />claim the affected land at the Schwartzwalder Mine: <br />Dismantle Buildings/Surface Facilities <br />kt~/` <br />Alpha Survey C°6„~a-•~^"'^ ~~,,.,~,"/"'' Bi hrs. @ $12.00/hr. 1,020.00 <br />Disassemble/wr,eck Buildings 15E5 hrs. @ $12.00/hr. 18,780.00 <br />Salvage Operations ~~~,<k C~°f~,~a„~1 517 hr;. @ $12.00/hr. 6,120.00 <br />~~,. <br />~011.(.1M1Vt5 W~-CXA-~Rk ~ (°'Q_ f~A"29C ~~`~w~or,)~ <br />S ate Clean-up ~~ ~ ~~) ~~ e <br />- U V.S~ 3-~ S'~a.a.~r-Q. ~ - / i <br />(Including removal of major pipes and cu verts, finish grading f topso <br />placement of erosion control structures and construction of step and pool <br />streambed configuration.) <br />D-7 Dozer 132 hrs. @ $120/hr <br />966 loader 20 hrs. @ $ 60/hr <br />Construct Step and Pool Steambed <br />Purchase and Plncement of Topsoil <br />30 ~` 24,200 cu. yden @ $5.00/cu.yd. <br />vi.. a hl.~-ate {-~oi..~'~ co s-t-s ~/~ ~-o s,o, <br />~~ ~` 1-1vw vole-,...a-. ~~'Q f <br /> <br /> <br />15,840.00 <br />1,200.00 <br />].08 , 000.00 <br />].21, 000.00 <br /> <br />~o/~ <br />